Description |
Client |
Date of
Completion |
 |
Sundry Works for.Agricultural Sections in Ahmadi & Kuwait Areas. |
K.O.C |
1953 |
 |
Clearance of Drift Sand in all Company Areas. |
K.O.C |
1953 |
 |
Sand Break Fencing Works & Sand Dune Stabilization in all areas. |
K.O.C |
1954 |
 |
Supply of Hard Core for Construction of South Pier. |
K.O.C |
1954 |
 |
Sundry Works for Agricultural Sections in Ahmadi and Kuwait Areas. |
K.O.C |
1955 |
 |
Clearance of Drift Sand in all Company Areas. |
K.O.C |
1955 |
 |
Sand Break Fencing Works & Sand Dune Stabilization in all areas. |
K.O.C |
1955 |
 |
Construction of Ahmadi Golf Course. |
K.O.C |
1956 |
 |
Construction of Dormitories at IBI Camp - Mina AI-Ahmadi. |
K.O.C |
1956 |
 |
Construction of Batching Plant Reinforced Concrete Foundations at Engineering DeRot Ahmadi. |
K.O.C |
1957 |
 |
Construction of Batching Plant Reinforced Concr-ete Cement Silos at Engineering Depot, Ahmadi. |
K.O.C |
1957 |
 |
Construction of Drilling Rig Platforms and Approach Roads & Maintenance of Unpaved Roads. |
K.O.C |
1957 |
 |
Sundry Works for Agricultural Section in Ahmadi'and Kuwait. |
K.O.C |
1957 |
 |
Clearance of Drift Sand in all Company areas. |
K.O.C |
1957 |
 |
Sand Break, Fencing Works & Sand dune Stabilization. |
K.O.C |
1957 |
 |
Construction of 20 Nos. KS8 Type Houses - 10 Pairs. |
K.O.C |
1957 |
 |
Construction of 14 Nos. KS.9A Type Houses - 7 Pairs. |
K.O.C |
1957 |
 |
Operation of the Crushing Plant Engineering Depot, Ahmadi. |
K.O.C |
1958 |
 |
Operation of.the Company's Transit Concrete Mixer Vehicles. |
K.O.C |
1958 |
 |
Sand Break Fencing Works and Sand Dune Stabilization in all areas. |
K.O.C |
1958 |
 |
PaintinQ Barges at Mina-al-Ahmadi & Mina Al-Ahmadi Areas |
K.O.C |
1958 |
 |
Sundry Works for I/c Agriculture in Ahmadi and Kuwait Areas. |
K.O.C |
1958 |
 |
Laying Precast Concrete Kerbs and Paving Slabs & Footpaths in Ahmadi & Mina AI-Ahmadi areas. |
K.O.C |
1958 |
 |
Conversion of House KL2P. Plot 7 Precincts 4 for Dhobies and Dhobi Ghat. South Ahmadi. |
K.O.C |
1958 |
 |
Painting Wellhead Installations and Crash Barriers in the Field Areas |
K.O.C |
1958 |
 |
Construction of Filling Station No.l0 (Research Station). |
K.O.C |
1958 |
 |
Construction of 10 Nos. KS 9A Houses (Nos.105-114),Ahmadi. |
K.O.C |
1958 |
 |
Preparatory Work for Repairs to Ahmadi, Shuwaikh Road. |
K.O.C |
1958 |
 |
Construction of Filling Station No. 11, Farwaniyah. |
K.O.C |
1958 |
 |
Improvements to Brackish Water Supply, Ahmadi. |
K.O.C |
1958 |
 |
Construction of 16 No. KS.9A Type Houses (Nos. 115 130) Ahmadi. |
K.O.C |
1958 |
 |
Surface Water Drainage within Bunds to Tanks. Nos. 651,652,250, 251, 252, & 701, Refinery Area, Mina. |
K.O.C |
1958 |
 |
Erection of Prefabricated Well Head Fences in the Ahmadi, Burgan and Magwa Field Areas (Part II). |
K.O.C |
1958 |
 |
Removal of Overburden from Lime Stone Quarry, S.E. Ahmadi. |
K.O.C |
1958 |
 |
Construction of 14 Nos. KS.12 Type Houses (Nos. 47-60), Ahmadi. |
K.O.C |
1958 |
 |
Maintenance of GQlf Course, Ahmadi. |
K.O.C |
1958 |
 |
Construction of 20 Nos. KS.12 Type Houses (Nos. 61-80), Ahmadi. |
K.O.C |
1958 |
 |
Sundry Works for Agriculture Section in Ahmadi & Kuwait areas. |
K.O.C |
1959 |
 |
Sundry Modifications to Petrol Filling Stations Nos. 2, 3, 4, 5, 6 & 7 in the Kuwait and Shuwaikh Areas. |
K.O.C |
1959 |
 |
Manufacture of 1000 Geological Core Boxes. |
K.O.C |
1959 |
 |
Assembly of Wardrobes for Employee Housing, South Ahmadi. |
K.O.C |
1959 |
 |
Construction of Contractors Camp, Umm al Aish, North Kuwait. |
K.O.C |
1959 |
 |
Provision of Graded Shingle for Engineering Depot, Ahmadi. |
K.O.C |
1959 |
 |
Cleaning out and Internal Painting to Brackish Water Tanks at G.C. Nos. 1,3, 4,5,6 & 7. |
K.O.C |
1959 |
 |
Clearance of Drift Sand in all Company Areas. |
K.O.C |
1959 |
 |
Sand Break Fencing Works and Sand Dune Stabilization in all areas. |
K.O.C |
1959 |
| |
Construction of 20 Nos. KS.8 Type Houses (Nos. 409-428), East Ahmadi. |
K.O.C |
1959 |
 |
Construction of 28 Nos. KS8A Type Houses (Nos. 107-134), East Ahmadi |
K.O.C |
1959 |
 |
Construction of a Band Stand at the Hubara Club. |
K.O.C |
1959 |
 |
Erection of Wellhead Safety Barriers, etc. in S. E. Kuwait Fields. |
K.O.C |
1959 |
 |
Maintenance of Paved Roads and Footpaths in Company areas. |
K.O.C |
1959 |
 |
Construction of 24 Nos. KS.8A Type Houses (Nos. 135-158). East Ahmadi |
K.O.C |
1959 |
 |
Construction of Locker Room for Ahmadi Golf Club. K.O.C. Construction of 18 Nos. KS.17/1 and 2 No. KS.17/2 type Houses (Nos. 1-20) in South and East Ahmadi. |
K.O.C |
1960 |
 |
Construction of 18 Nos. KS.17/1 and 2 No. KS.17/2 type Houses (Nos. 1-20) in South and East Ahmadi. |
K.O.C |
1960 |
 |
Construction of Additional Bedroom to 10 Nos. KS.1 OA type Houses. |
K.O.C |
1961 |
 |
Fencing Works in the State of Kuwait. |
K.O.C |
1961 |
 |
Minor Works to . Flowline Systems in the State of Kuwait. |
K.O.C |
1961 |
 |
Construction of Production Office, Burgan. |
K.O.C |
1961 |
 |
Superstructure to Mess Hall, Public Security Head Quarters. |
K.O.C |
1961 |
 |
Supply.3/4" Crushed and Graded Shingle. |
K.O.C |
1961 |
 |
Construction of Prefabricated Timber Panel Offices of Consultants - East Ahmadi. |
M.F. & O. |
1961 |
 |
Construction of 28 Pairs of KS.8A type Houses - East Ahmadi. 56 Houses. |
M.F. & O. |
1961 |
 |
Construction of Telephone Exchange - East Ahmadi: |
M.F. & O. |
1961 |
 |
Construction of Drilling Rig Platforms and approach roads and maintenance of unpaved roads |
K.O.C |
1962 |
 |
Construction of 12 Pairs of KS.1 A & B Type Houses. East Ahmadi. 24 Houses. |
M.F. & O. |
1962 |
 |
Fuel Tanker Loading Point Industrial Area, Ahmadi. |
K.O.C |
1963 |
 |
Redecking of the South Pier (Stage I and Part Stage II) |
K.O.C |
1963 |
 |
Repair and Maintenance of Paved Roads and Footpaths in Company Areas. |
K.O.C |
1963 |
 |
Levelling & Asphalting of Pavements in Fahaheel. |
M.P.W. |
1963 |
 |
DRS/M/144 Supply of Sand for Arab Gulf Street. |
M.P.W. |
1964 |
 |
DRS/S/17A Sewage House Connections. |
M.P.W. |
1964 |
 |
Repainting of Structural Steelwork of South Pier (Part VI). |
K.O.C |
1964 |
 |
Cleaning Works at Gathering Centres. |
K.O.C |
1964 |
 |
Drift and Sand Clearance and Associated Works. |
K.O.C |
1964 |
 |
Construction of Drilling Rig Platforms and Approach Roads & Maintenance of Unpaved Roads in all Company Areas. |
K.O.C |
1964 |
 |
Repair and Maintenance of Paved Roads and Footpaths in Company areas. |
K.O.C |
1965 |
 |
Garden Maintenance and Associated Works. |
K.O.C |
1965 |
 |
Maintenance of Production Department's Installations. |
K.O.C |
1965 |
 |
Gardening & Associated Works, Public Gardens, Ahmadi and other Locations. |
K.O.C |
1965 |
 |
Public Park and Sports Ground, Fahaheel. |
K.O.C |
1966 |
 |
Construction of New Roads in Refinery, Mina-al-Ahmadi and Resurfacing Works to Roads in Ahmadi, Magwa and Burgan. |
K.O.C |
1966 |
 |
Levelling & Oil Spraying at Airport. |
M.P.W. |
1966 |
 |
Road & Runways Maintenance at Kuwait Airport. |
M.P.W. |
1969 |
 |
Construction of an Additional Bedroom to 34 Nos. Staff Houses - Ahmadi. |
K.O.C |
1969 |
 |
Construction of an Additional Bedroom to 18 Nos. Staff Houses, Ahmadi (1969) Programme. |
K.O.C |
1969 |
 |
Construction, Repair and Maintenance of Paved Roads and Footpaths in Company Areas. |
K.O.C |
1969 |
 |
Garden Maintenance and Associated Works in Area 1. |
K.O.C |
1969 |
 |
Dual Carriageway - Ahmadi Governorate to Fahaheel Roundabout. |
K.O.C |
1969 |
 |
Redecking of the South Pier (Stage VI) |
K.O.C |
1970 |
 |
Construction of Combined Parcels Post Office/Police Post, South Ahmadi. |
K.O.C |
1971 |
 |
RDD/R/152 Construction of Roads, Stormwater, Drainage, Saflitary Sewers & Services to 'Badawieh and Sabahieh. |
M.P.W. |
1972 |
 |
RDDfR/239 Kuwait International Airport Maintenance, Reconstruction and Execution of Runways and Taxiways. |
M.P.W. |
1972 |
 |
Repairs to Furnace Foundation at Crude Distillation Unit No.1 Refinery. |
|
1972 |
 |
Structural'Repairs & Repainting of Dasman Palace Jetty. |
|
1972 |
 |
Construction of New Access Roads and Parking Areas at 9 Gathering Centres 1-7,9 & 10. |
|
1972 |
 |
Repairs to Concrete Foundations of Eleven Vessels at LPG Fractionation Unit No.2, Refinery. |
|
1972 |
 |
Construction of Security Buildings and Roads to West side of Mina AI Ahmadi Operational Area. |
|
1972 |
 |
RDD/R/253 Maintenance and Re-asphalting of Roads. |
M.P.W. |
1973 |
 |
Administration Building ExtensionShuaiba. |
K.C.F.C. |
1973 |
 |
Shuaiba Clinic. |
K.C.F.C. |
1973 |
 |
Maintenance of Paved Roads and Rig Foundations. |
K.O.C |
1973 |
 |
Fencing at IRI Camp Beach - Fahaheel. |
K.O.C |
1973 |
 |
Additional Bedrooms to Staff Houses 1 974 Programme (Part II). |
K.O.C |
1974 |
 |
Extension and Modification to KS5 House No. 49. 1 st Street. North. |
K.O.C |
1974 |
 |
Maintenance of Paved Roads & Construction of Drilling Rig Foundations. |
K.O.C |
1974 |
 |
Reconstruction of Road. Mina Security Post Area. |
K.O.C |
1974 |
 |
Overhaul and Survey of Hoisting Equipment on South Pier. |
|
1974 |
 |
Additional Bedrooms to Staff Houses 1975 Programme, Central Ahmadi. |
K.O.C |
1975 |
 |
Additional Bedrooms to Staff Houses 1975 Programme. Phase 11 Part I. |
K.O.C |
1975 |
 |
Construction of Culvert Drainage & Infrasections of Salemieh, Ben Mughirah and Baghdad Streets. |
M.P.W. |
1975 |
 |
Construction of Roads at Um-Ghara Agricultural Area. |
M.P.W. |
1975 |
 |
Construction of Roads and Stormwater Drainage and Services at Juleeb AI-Shouk. |
M.P.W. |
1975 |
 |
Improvements to Unity Club Entrance. |
K.O.C. |
1975 |
 |
Maintenance and Re-asphalting of Roads anG Crossings. |
M.P.W. |
1975 |
 |
Construction of Shuwaikh Out-Patients Clinic. |
M.P.W. |
1975 |
 |
Construction of New Vehicle Transportation Camp Ammunition Military Airport. |
M.O.D. |
1975 |
 |
Civil Works 01 Uqeilah Water Filling Station. |
M.E.W |
1975 |
 |
MPD/C-21 Construction of Shuwaikh Port Western Extension - Phase II (Jt. Venture with M/s. Ali AI-Ghanim Establishment). |
M.P.W. |
1975 |
 |
Additional Bedrooms to Staff Houses 1975 Programme, Central Ahmadi. |
K.O.C. |
1976 |
 |
Modification to Sewage Disposal System Umm-AI-Aish Camp. North Kuwait. |
K.O.C. |
1976 |
 |
Sand Control |
K.O.C. |
1976 |
 |
Construction of New Offices for Ministry of Social Affairs and Labour, Ahmadi. |
K.O.C. |
1976 |
 |
Renovation of Existing Road Rainwater Flume (Mina ai-Ahmadi). |
K.O.C. |
1976 |
 |
Additional Bedrooms to 21 Nos. Staff Houses, Central Ahmadi 1976 Programme Phase I - Part II. |
K.O.C. |
1976 |
 |
Building, Repair & Oiling of Tank Bunds & Flumes at Mina AI-Ahmadi Refinery. |
K.O.C. |
1976 |
 |
Road Widening & Resurfacing between GC1 and Abduliyah. |
K.O.C. |
1976 |
 |
Construction of Dual Carriageway from J. 66 Roundabout to Shuaiba Junction. |
K.O.C. |
1976 |
 |
Renovation of 12 Nos. KS-12 Bachelor Flat Blocks. |
|
1976 |
 |
Construction of 132/33/11 KV. Sub-station - 6th Ring Road. |
M.E.W |
1976 |
 |
K.G.P. Construction of Reinforced Concrete Tank Foundation Rings. KOC Gas Project. |
K.O.C. |
1976 |
 |
K.G.P. Supervisors Camp Roads Construction - Mina and Fahaheel lntersections. KOC Gas Project. |
K.O.C. |
1976 |
 |
SUPPLY & INSTALLATION OF 132 KV POWER CABLES, PILOT CABLES & ACCESSORIES ( CIVIL WORKS) |
M.E.W.
CABLE DE LEYON |
1976 |
 |
MILITARY SHEDS FOR M.O.D. |
M.O.D. |
1976 |
 |
OUT-PATIENT CLINIC IN SHUWAIKH |
M.P.W |
1976 |
 |
Oil Dispensing Stores for North & South Pier. |
|
1977 |
 |
Works at Drilling Locations Ratqa 5, 7 and 8 North Kuwait. |
|
1977 |
 |
MPD/1/1976 Dredging, Maintenance and Clearance to existing Harbour Failaka. |
M.P.D. |
1977 |
 |
R/286 Sea Rock Excavation & Hauling & Backbill for reclamation of Gulf Street Phase IV. |
R.D.D |
1977 |
 |
R/273 Construction of roads, Stormwater drainage, Water Network and Telephone,& Electricity Services for Low Income Housing 'tillage of Mina Abdullah (Shaabieh). |
R.D.D |
|
 |
UQAILAH WATER FILLING STATION |
M.E.W. |
1977 |
 |
CAR PARKING SHEDS AT JM1RA |
M.O.D. |
1977 |
 |
CIVIL WORKS Of 6TH RING ROAD Sub-Station |
M.E.W. |
1977 |
 |
CIVIL WORKS OF Sub- Station AT Shuaibah |
M.E.W. |
1977 |
 |
Asphalt and kerbing works for the new centralized maintenance complex, Burgan. |
|
1978 |
 |
AMINOIL & W.O.C. Mina abdulla to Walra Oil Fields 45km. single lane Roadway and Shoulders. |
|
1978 |
 |
Construction of New Cool Storage Bldg. in Ahmadi Industrial area. |
K.O.C. |
1978 |
 |
Construction of Riqqa Neighbourhood Centre |
M.P.W. |
1978 |
 |
Construction -and maintenance of Kuwait International Airport Runways, taxiways, aprons, Intersections, Roads and Footpaths,. |
D.G.C.A |
1978 |
 |
Civil Works of 132 KV Sub- Station at Shuaiba. |
M.E.W. |
1978 |
 |
Construction of Offices and Workshop facilities - East Ahmadi. |
A.S.C.C |
1978 |
 |
Roads Maintenance. |
K.O.C |
1978 |
 |
Roadworks to Gathering Centres and Abdulliyah |
K.O.C |
1978 |
 |
Infrastructures to Sabah AI-Salim Housing Project. Sectors 1. 2. 6. 7 & 8. |
N.H.A. |
1978 |
 |
GHB/C/6077/78 Hadiyah Housing Project consisting of 271 Mid-Income Group Villas and services in infrastructures. |
N.H.A. |
1978 |
 |
RIQQA NEIGHBOURHOOD CENTRE |
M.P.W. |
1978 |
 |
IMPROVED HAWK AIR Basc DEFENCE SYSTEM |
M.O.D. |
1981 |
 |
HADIYA HOUSING PROJECT |
N.H.A. |
1981 |
 |
WATER NETWORK |
M.O.D. |
1982 |
 |
SALMIYA "D" & AL-RASS "B" Sub-Stations |
M.E.W.
COGELEX ALSTHOM |
1983 |
 |
COMBINED SHOOTING RANGE |
M.O.D. |
1983 |
 |
Dasmah & JALEEB SIIOYOUK STATIONS |
M.E.W
COGELEX ALSTI-IOM |
1983 |
 |
EMBASSIES & MIDDLE AREA SUB-STATIONS |
M.E.W.
COGELEX ALSTHOM |
1983 |
 |
WATER SUPPLY SYSTEM |
M.O.D. |
1983 |
 |
MAINTENANCE OF GOVERNMENT BUILDINGS |
M.P.W. |
1983 |
 |
Farwaniah "B" SUB- STATION |
M.E.W. COGELEX ALSTHOM |
1984 |
 |
JAHRA "E" SUB-STATION |
M.E.W.
SPRECHER & SCH. |
1984 |
 |
JABRIEII "C" SUB-STATION |
M.E.W.
COGELEX ALSTHOM |
1984 |
 |
SOUTH ARDIYA "A" & "C" SUB-STATIONS |
M.E.W.
SPRECHER ENERGIE |
1984 |
 |
SOUTH ARDIYA "B" SUB-STATION |
M.E.W.
COGELEX ALSTHOM |
1984 |
 |
CONSTRUCTION OF Shuwaik "W" SUB-STATION ( 300 ) KVA |
M.E.W.
COGELEX ALSTHOM |
1984 |
 |
CONSTRUCTION OF 7 SUB-STATIONS 132 KVA |
M.E.W. |
1984 |
 |
CONSTRUCTION OF 3 SUB-STATIONS 132 KVA |
M.E.W. |
1984 |
 |
DESIGN, CONSTRUCTION & MAINTENANCE OF A GARAGE fr SERVICES IN MISHREF |
M.O.D. |
1985 |
 |
AL-BENAIDER MOSQUE |
SHEIKHAN AL-FARSI |
1985 |
 |
FENCING PROJECT |
M.O.D. |
1985 |
 |
FENCING PROJECT |
M.O.D. |
1985 |
 |
FLOUR MILL "A" SUB-STATION |
M.E.W. COGELEX ALSTHOM |
1985 |
 |
RESEARCH INSTITUTE SUB-STATION |
M.E.W.
COGELEX ALSTHOM |
1985 |
 |
MAINTENANCE OF GOVERNMENT BUILDINGS |
M.P.W. |
1985 |
 |
Khaitan Extension Sub- Station |
M.E.W.
B.B.C. |
1985 |
 |
JAHRA "G" SUB-STATION |
M.E.W. COGELEX ALSTHOM |
1986 |
 |
RUMAITHIYA "B" SUB-STATION |
M.E.W.
SPRECHER ENERGIE |
1986 |
 |
MISHREF "A" SUB-STATION |
M.E.W.HITACHI LTD. |
1986 |
 |
ASSALAM "C" SUB-STATION |
M.E.W. COGELEX ALSTHOM |
1986 |
 |
JAHRA "W" SUB-STATION "132 K.V.A " |
M.E.W. COGELEX ALSTHOM |
1986 |
 |
MISCELLANEOUS CIVIL WORKS FOR Shuwaikh POWER & WATER PRODUCTION STATION. |
M.E.W. |
1986 |
 |
ABU-HALIFA "C" SUB-STATION |
M.E.W.
SIEMENS |
1986 |
 |
JAHRA "H" SUB-STATION |
M.E.W.
SPRECHER ENERGIE |
1986 |
 |
MAINTENANCE OF 10TH AREA |
M.P.W |
1986 |
 |
KHITAN "D" SUB-STATION |
M.E.W.
HITACHI |
1986 |
 |
CONSTRUCTION OF 8 SUB-STATIONS 132 KVA |
M.E.W.
B.B.C. |
1986 |
 |
SULAIBIYA "E" SUB-STATION |
M.E.W. SIEMENS |
1987 |
 |
FINATEES "B" SUB-STATION |
M.E.W.
A.B.B. |
1987 |
 |
WATTIYA "A" SUB-STATION |
M.E.W. SIEMENS |
1987 |
 |
FINATEES "A" SUB-STATION |
M.E.W.
A.B.B. |
1987 |
 |
OMARIYA SUB-STATION EXTENSION |
M.E.W. COGELEX ALSTHOM |
1987 |
 |
JAHRA "D" SUB-STATION |
M.E.W. HITACHI LTD. |
1987 |
 |
JAHRA "W" SUB-STATION "300 K.V.A " |
M.E.W. COGELEX ALSTHOM |
1988 |
 |
DCC - TOWN SECURITY AREA |
M.E.W.
MITSIBUSHI |
1988 |
 |
JALEEB "C" SUB-STATION |
M.E.W.
SPRECHER ENERGIE |
1988 |
 |
FAHAHEEL "F" SUB-STATION |
M.E.W .SPRECHER ENERGIE |
1988 |
 |
SHUWAIKH "W" SHUNT REACTOR |
M.E.W. COGELEX ALSTHOM |
1989 |
 |
AL-ZOUR "A" EXTENSION |
M.E.W.
B.B.C. |
1989 |
 |
250 MVAR SHUNT REACTOR AND EXTENSION OF 300 KV SUBSTATIONS AT STHRING ROAD AND SHUAIBA "W" |
M.E.W. SIEMENS |
1989 |
 |
KHlTAN "C", UNIVERSITY CAMPUS "A", AND KNPC "B" SUB-STATIONS |
M.E.W.
A.B.B. |
1989 |
 |
WEST K.N.P.C. 6.6 KV SUB-STATION |
K.N.P.C.
A.B.B. |
1990 |
 |
Kuwait Town Hightways |
|
1990 |
 |
REPAIR WORKS FOR SCHOOLS |
BROWN & ROOT CO. |
1991 |
 |
CRUSHING PLANT Sub-Station |
M.E.W.
TRANSELEKTRO |
1992 |
 |
AL-OMARIAH 300 KVA SUBSTATION |
M.E.W. COGELEX ALSTHOM |
1992 |
 |
K.N.P.C. "A" SUB-STATION |
M.E.W. A.B.B. |
1992 |
 |
AL-SALMIAH "W" SUB-STATION |
M.E.W. A.B.B. |
1993 |
 |
REPLACEMENT OF EXISTING CEMENT PIPES OF FRESH ~ BRACKISH DISTRIBUTION NET WATER BY D.l. PIPES IN AL-RABIA AREA |
M.E.W. |
1994 |
 |
JAHRA DISTRICT CONTROL CENTRE |
M.E.W. COGELEX ALSTHOM |
1994 |
 |
DEMOLITION WORKS AT SI-IUWAIKH POWER & WATER PRODUCTION STATION |
M.E.W.
AL-BAIDA'A CO. |
1994 |
 |
SUPPLY & ERECTION OF 2 X 75 MVA POWER TRANSFORMER FOR 6TH RING ROAD "A" SUB-STATION |
M.E.W. COGELEX ALSTHOM |
1994 |
 |
WAFRA "A" SUB-STATION |
M.E.W. TRANSELEKTRO |
1994 |
 |
6TH BRIGADE 132./11 KV SUB-STATION |
M.E.W. TRANSELEKTRO |
1994 |
 |
McDONALD'S STORE AT THE SEA FRONT - ENTRANCE NO.: ( 3 ) |
KUWAIT FINANCE HOUSE |
1994 |
 |
UM-QUDAIR "Q" SUB-STATION |
M.E.W. TRANSELEKTRO |
1994 |
 |
SUPPLY AND ERECTION OF 33 KV & 11 KV OHTL AND 13/11 KV 4 MVA TRANSFORMERS |
M.E.W. TRANSELEKTRO |
1994 |
 |
REPAIR, CONSTRUCTION AND MAINTENANCE OF McDONALDS AL-FERWANIAH |
KUWAIT FINANCE HOUSE |
1995 |
 |
CONSTRUCTION, EXECUTION & MAINTENANCE OF KUWAIT FINANCE HOUSE AT SHUWAIKH AREA |
KUWAIT FINANCE HOUSE |
1996 |
 |
CONSTRUCTION OF CIVIL WORKS FOR TRANSMITTING "N" SUB STATION AT MUTLAA' AREA |
M.E.W. TRANSELEKTRO |
1997 |
 |
SUPPLY & INSTALLATION OF 132 KV PETROCHEMICAL COMPLEX "A" 132/11 KV |
M.E.W.
COGELEX ALSTHOM |
1997 |
 |
EXECUTION OF CIVIL WORKS FOR FUNAITEES "F" 132/11 KV SUB-STATION |
M.E.W. TRANSELEKTRO |
1997 |
 |
SUPPLY & INSTALLATION OF 132 KV & 33 KV OBHL AT UM-QUDAIR & SALIBIAH |
M.E.W. TRANSELEKTRO |
1997 |
 |
SUPPLY, ERECTION, COMMISSIONING AND TESTING OF CONTROL AND RELAY PANELS AND OTHER MISCELLANEOUS FOR EXISTING 132 KV SWITCHGEARS AT SHUAIBA NORTH POWER STATION |
M.E.W.
COGELEX ALSTHOM |
1997 |
 |
CIVIL WORKS REPAIR FOR (16 NOS.) OF SUBSTATIONS. |
M.E.W. |
1998 |
 |
SUPPLY & INSTALLATION OF NEW 2X50 MVAR 132 KV SHUNT REACTORS FOR ABU-HALIFA "C" S/S. AND 1X50 MVAR 132 KV SHUNT REACTORS FOR SHUAIBA "A" S/S. |
M.E.W. TRANSELEKTRO |
1999 |
 |
SUPPLY & INSTALLATION OF 6X50 MVAR 132 KV SHUNT REACTORS IN DIFFERENT SUB-STATIONS AND 1X30 MVA TItANSFORMERS AND 1X33 KV SWITCHGEAR BAY AT RAWDATAIN "A" S/S. & TIlE RELATED DESIGN WORKS. |
M.E.W.
COGELEX ALSTHOM |
1999 |
 |
CIVIL WORKS FOR SHUAIBA INDUSTRIAL AREA "A" 33/11 KV SUB-STATION |
M.E.W.
COGELEX ALSTHOM |
2000 |
 |
CIVIL WORKS FOR SOUTH SABAHIYA 132/11 KV SUB-STATION |
M.E.W. TRANSELEKTRO |
2001 |
 |
SUPPLY & INSTALLATION OF 132/11KV SUB-STATIONS AT SULAIBIKHAT "B" AND FIRDOUS "A" |
M.E.W. COGELEX ALSTHOM |
2001 |
 |
SUPPLY&INSTALL OF 3 132/11 KV SUB-STATIONS AT SOUTH JAHRA"B","D"& "G". |
M.E.W. COGELEX ALSTHOM |
2001 |
 |
CIVIL WORKS FOR WEST JELEEB "A" & SOUTH JAHRA "A" 132/11 KV SUB-STATIONS |
M.E.W.
HYUNDAI
ENGINEERING &
CONST. CO. |
2001 |
 |
SUPPLY AND INSTALLATION OF 132/11 KV MINA ABDULLA "E" & SABHAN "C" SUBSTATIONS |
M.E.W.
ANSALDO |
2002 |
 |
MAINTENANCE WORKS EXECUTION, REPAIRE,CIVIL WORKS FOR SCHOOLS & MINISTRY'S BUILDINGS AT MUBARAK AL-KABER EDUCATIONAL AREA |
M.O.E. |
2003 |
 |
CIVIL & BUILDING CONSTRUCTION WORKS FOR SHAMIEH "A" 132/11 KV SUBSTATION |
M.E.W.
HYUNDAI |
2004 |
 |
MAINT. FOR GOV.BUILDINGS AT DIFF. AREAS-FIRST AREA |
M.P.W. |
U.C. . |
 |
SUPPLY & INSTALLATION OF 2 NOS. 132/11 KV SUB-ST. OGAILA "B" & "C" |
M.P.W. NGEECO |
2004 |
 |
SUPPLY & INSTALLATION OF 2 NOS. 33/11 KV SUB-ST. HOHA "M", SULIBIKHAT "M" |
M.E.W SIEMENS |
2005 |
 |
AL LHIRAN SINSTATION |
M.E.W A.B.B. |
UC |
 |
SUPPLY & INSTALLATION JAHRA "D" 132 KV SUB STATION |
MEW TRANSELEKTRO |
UC |